Timeline in Vue Gantt Chart Component
18 Mar 202624 minutes to read
In the Gantt Chart component, timeline is used to represent the project duration as individual cells with defined unit and formats.
Timeline view modes
Gantt contains the following in-built timeline view modes:
- Hour – Minute
- Day – Hour
- Week – Day
- Month – Week
- Year – Month
Timescale mode in the Gantt Chart component can be defined using the timelineViewMode property, and you can define a timescale mode for the top tier and bottom tier using the topTier.unit and bottomTier.unit properties.
Week timeline mode
In the Week timeline mode, the upper part of the schedule header displays the weeks, whereas the bottom half of the header displays the days. Refer to the following code example.
<template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
const data = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 }
]
},
];
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
};
const timelineSettings = {
timelineViewMode:'Week',
};
</script><template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 }
]
},
],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
timelineSettings: {
timelineViewMode:'Week',
},
};
},
};
</script>Month timeline mode
In the Month timeline mode, the upper part of the schedule header displays the months, whereas the bottom header of the schedule displays its corresponding weeks. Refer to the following code example.
<template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
const data = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 }
]
},
];
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
};
const timelineSettings = {
timelineViewMode:'Week',
};
</script><template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 14, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 14, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 14, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 14, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 14, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 14, Progress: 50 }
]
},
],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
timelineSettings: {
timelineViewMode:'Month',
timelineUnitSize:150,
},
};
},
};
</script>Year timeline mode
In the Year timeline mode, the upper schedule header displays the years whereas, the bottom header displays its corresponding months. Refer to the following code example.
<template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
const data = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 50 }
]
},
];
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
};
const timelineSettings = {
timelineViewMode:'Week',
};
</script><template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 54, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 54, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 54, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 54, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 54, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 54, Progress: 50 }
]
},
],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
timelineSettings: {
timelineViewMode:'Year',
timelineUnitSize:70
},
};
},
};
</script>Day timeline mode
In the Day timeline mode, the upper part of the header displays the days whereas, the bottom schedule header displays its corresponding hours. Refer to the following code example.
<template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
const data = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
isParent:true,
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50,isParent:false },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50, resources: [2, 3, 5],isParent:false },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 2,Predecessor:"2FS", Progress: 50,isParent:false },
]
},
];
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
};
const timelineSettings = {
timelineViewMode:'Day',
};
</script><template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
isParent:true,
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50,isParent:false },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50, resources: [2, 3, 5],isParent:false },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 2,Predecessor:"2FS", Progress: 50,isParent:false },
]
},
],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
timelineSettings: {
timelineViewMode:'Day',
},
};
},
};
</script>Hour timeline mode
An Hour timeline mode tracks the tasks in minutes scale. In this mode, the upper schedule header displays hour scale and the lower schedule header displays its corresponding minutes.
<template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
const data = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
isParent:true,
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50,isParent:false },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50, resources: [2, 3, 5],isParent:false },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 2,Predecessor:"2FS", Progress: 50,isParent:false },
]
},
];
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
};
const timelineSettings = {
timelineViewMode:'Day',
};
</script><template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
isParent:true,
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50,isParent:false },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 2, Progress: 50, resources: [2, 3, 5],isParent:false },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 2,Predecessor:"2FS", Progress: 50,isParent:false },
]
},
],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
timelineSettings: {
timelineViewMode:'Hour',
},
};
},
};
</script>Timeline view dates
The Gantt Chart control supports rendering a fixed timeline range using the viewStartDate and viewEndDate properties. These properties allow the visible portion of the timeline to be explicitly defined and locked within the Gantt chart UI, independent of the project’s overall scheduling boundaries defined by projectStartDate and projectEndDate. The projectStartDate and projectEndDate values represent the full scheduling window for the project and are used for baseline processing, critical-path calculations, and project-level reporting. By default, both viewStartDate and viewEndDate are set to auto. The following example demonstrates how to configure a custom timeline view range.
<template>
<ejs-gantt height="430px" :dataSource="data" :taskFields="taskSettings" :timelineSettings="timelineSettings"
:projectStartDate="projectStartDate" :projectEndDate="projectEndDate">
</ejs-gantt>
</template>
<script setup>
import { ref } from "vue";
import { GanttComponent as EjsGantt, } from "@syncfusion/ej2-vue-gantt";
import { provide } from "vue";
provide("gantt", []);
const data = ref([
{
TaskID: 1,
TaskName: "Project Initiation",
StartDate: new Date("04/02/2019"),
EndDate: new Date("04/21/2019")
},
{ TaskID: 2, TaskName: "Identify Site location", StartDate: new Date("04/02/2019"), Duration: 4, ParentID: 1, Progress: 50 },
{ TaskID: 3, TaskName: "Perform Soil test", StartDate: new Date("04/02/2019"), Duration: 4, ParentID: 1, Progress: 50 },
{ TaskID: 4, TaskName: "Soil test approval", StartDate: new Date("04/02/2019"), Duration: 4, ParentID: 1, Progress: 50 },
{
TaskID: 5,
TaskName: "Project Estimation",
StartDate: new Date("04/02/2019"),
EndDate: new Date("04/21/2019")
},
{ TaskID: 6, TaskName: "Develop floor plan for estimation", StartDate: new Date("04/04/2019"), Duration: 3, ParentID: 5, Progress: 50 },
{ TaskID: 7, TaskName: "List materials", StartDate: new Date("04/04/2019"), Duration: 3, ParentID: 5, Progress: 50 },
{ TaskID: 8, TaskName: "Estimation approval", StartDate: new Date("04/04/2019"), Duration: 3, ParentID: 5, Progress: 50 }
]);
const taskSettings = ref({
id: "TaskID",
name: "TaskName",
startDate: "StartDate",
duration: "Duration",
progress: "Progress",
parentID: "ParentID"
});
const timelineSettings = ref({
viewStartDate: new Date("04/03/2019"),
viewEndDate: new Date("04/07/2019")
});
const projectStartDate = ref(new Date("03/31/2019"));
const projectEndDate = ref(new Date("04/13/2019"));
</script><template>
<ejs-gantt height="430px" :dataSource="data" :taskFields="taskSettings" :timelineSettings="timelineSettings"
:projectStartDate="projectStartDate" :projectEndDate="projectEndDate">
</ejs-gantt>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt": GanttComponent
},
data() {
return {
data: [
{
TaskID: 1,
TaskName: "Project Initiation",
StartDate: new Date("04/02/2019"),
EndDate: new Date("04/21/2019")
},
{ TaskID: 2, TaskName: "Identify Site location", StartDate: new Date("04/02/2019"), Duration: 4, ParentID: 1, Progress: 50 },
{ TaskID: 3, TaskName: "Perform Soil test", StartDate: new Date("04/02/2019"), Duration: 4, ParentID: 1, Progress: 50 },
{ TaskID: 4, TaskName: "Soil test approval", StartDate: new Date("04/02/2019"), Duration: 4, ParentID: 1, Progress: 50 },
{
TaskID: 5,
TaskName: "Project Estimation",
StartDate: new Date("04/02/2019"),
EndDate: new Date("04/21/2019")
},
{ TaskID: 6, TaskName: "Develop floor plan for estimation", StartDate: new Date("04/04/2019"), Duration: 3, ParentID: 5, Progress: 50 },
{ TaskID: 7, TaskName: "List materials", StartDate: new Date("04/04/2019"), Duration: 3, ParentID: 5, Progress: 50 },
{ TaskID: 8, TaskName: "Estimation approval", StartDate: new Date("04/04/2019"), Duration: 3, ParentID: 5, Progress: 50 }
],
taskSettings: {
id: "TaskID",
name: "TaskName",
startDate: "StartDate",
duration: "Duration",
progress: "Progress",
parentID: "ParentID"
},
timelineSettings: {
viewStartDate: new Date("04/03/2019"),
viewEndDate: new Date("04/07/2019")
},
projectStartDate: new Date("03/31/2019"),
projectEndDate: new Date("04/13/2019")
};
}
};
</script>Key behaviors
When viewStartDate and viewEndDate are set to concrete Date values, the timeline rendering is restricted to the inclusive range [viewStartDate, viewEndDate].
- When
viewStartDateis set to auto:- If
projectStartDateis defined, the timeline begins atprojectStartDate. - If
projectStartDateis not defined, the earliest task start date is used as the beginning of the visible range.
- If
- When
viewEndDateis set toauto:- If
projectEndDateis defined, the timeline ends atprojectEndDate. - If
projectEndDateis not defined, the maximum task end date is used. If this end date leaves visible white‑space in the timeline area, the end date is automatically extended to fill the chart width.
- If
Note: The
ZoomToFitfeature usesprojectStartDateandprojectEndDateto fit the entire project within the available timeline viewport.
Week start day customization
In the Gantt Chart component, you can customize the week start day using the weekStartDay property. By default, the weekStartDay is set to 0, which specifies the Sunday as a start day of the week. But, you can customize the week start day by using the following code example.
<template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
const data = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
]
},
];
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
};
const timelineSettings = {
timelineViewMode:'Week',
};
</script><template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings"></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
]
},
],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
timelineSettings: {
timelineViewMode:'Week',
weekStartDay:3
},
};
},
};
</script>Customize automatic timescale update action
In the Gantt Chart component, the schedule timeline will be automatically updated when the tasks date values are updated beyond the project start date and end date ranges. This can be enabled or disabled using the updateTimescaleView property.
<template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings" :editSettings="editSettings"></ejs-gantt>
</div>
</template>
<script setup>
import { provide } from "vue";
import { GanttComponent as EjsGantt,Edit } from "@syncfusion/ej2-vue-gantt";
const data = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
]
},
];
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
};
const timelineSettings = {
updateTimescaleView:false
};
const editSettings={
allowEditing:true,
allowTaskbarEditing:true
};
provide('gantt', [ Edit ]);
</script><template>
<div>
<ejs-gantt id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :timelineSettings="timelineSettings" :editSettings="editSettings"></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent,Edit } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
]
},
],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
timelineSettings: {
updateTimescaleView:false
},
editSettings:{
allowEditing:true,
allowTaskbarEditing:true
}
};
},
provide: {
gantt: [ Edit ]
},
};
</script>s
Timeline cells tooltip
In the Gantt Chart component, you can enable or disable the mouse hover tooltip of timeline cells using the timelineSettings.showTooltip property. The default value of this property is true. The following code example shows how to enable the timeline cells tooltip in Gantt.
<template>
<div>
<ejs-gantt ref='gantt' :dataSource="data" id="GanttContainer" :taskFields = "taskFields" :height = "height" :columns="columns" :timelineSettings="timelineSettings" ></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
const data = editingData;
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
};
const timelineSettings = {
showTooltip: true
};
const columns = [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' }
];
</script><template>
<div>
<ejs-gantt ref='gantt' :dataSource="data" id="GanttContainer" :taskFields = "taskFields" :height = "height" :columns="columns" :timelineSettings="timelineSettings" ></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: editingData,
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
timelineSettings: {
showTooltip: true
},
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
]
};
},
};
</script>Show/hide weekends
The timelineSettings.showWeekend property is used to customize the timeline in the Gantt Chart component by controlling the visibility of weekends. To exclude weekends from the timeline, set the showWeekend property to false in the timelineSettings configuration. This feature is particularly useful for focusing the timeline on working days, enhancing project management efficiency by hiding weekends from the view.
Note: To customize non-working or weekend days in the Gantt chart, refer to the workWeek documentation for detailed information.
<template>
<div>
<ejs-gantt ref='gantt' :dataSource="data" id="GanttContainer" :taskFields = "taskFields" :height = "height" :columns="columns" :timelineSettings="timelineSettings" ></ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
const data = editingData;
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
};
const timelineSettings = {
showWeekend: true
};
const columns = [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' }
];
</script><template>
<div>
<ejs-gantt ref='gantt' :dataSource="data" id="GanttContainer" :taskFields = "taskFields" :height = "height" :columns="columns" :timelineSettings="timelineSettings" ></ejs-gantt>
</div>
</template>
<script>
import { GanttComponent } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
data: function() {
return{
data: editingData,
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
timelineSettings: {
showWeekend: true
},
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
]
};
},
};
</script>Limitations
- The
showWeekendfeature does not support baselines.- The
showWeekendis not compatible with the manual task mode.- Non-working hours cannot be excluded when
showWeekendis set to false.- Holidays are not excluded from the timeline if
showWeekendis set to false.
Timeline template
In the Gantt Chart component, you can customize timeline cells using the timelineTemplate property, allowing for the customization of HTML content within timeline cells. This feature enhances the visual appeal and enables personalized functionality.
When designing the timeline cells, you can utilize the following context properties within the template:
-
date: Defines the date of the timeline cells. -
value: Defines the formatted date value that will be displayed in the timeline cells. -
tier: Defines whether the cell is part of the top or bottom tier.
The following code example how to customize the top tier to display the week’s weather details and the bottom tier to highlight working and non-working days, with formatted text for holidays.
<template>
<div>
<ejs-gantt ref='gantt' :dataSource="data" id="GanttContainer" :taskFields="taskFields" :treeColumnIndex="1"
:holidays="holidays" :labelSettings="labelSettings" :splitterSettings="splitterSettings" :height="height"
:columns="columns" :timelineSettings="timelineSettings" :timelineTemplate="'timelineTemplates'">
<template v-slot:timlelineTemplate="{ data }">
<div v-if="data.tier == 'topTier'" class="e-header-cell-label e-gantt-top-cell-text"
style="width:100%;background-color: #FBF9F1 ; font-weight: bold;height: 100%;display: flex; justify-content: center ; align-items: center; "
title={{data.date}}>
<div> {{ value }}</div>
<div style="width:20px; height: 20px; line-height: normal; padding-left: 10px; ">
<img :style="{ width: '100%', height: '100%' }" :src="imagedate()">
</div>
</div>
<div v-else-if="data.tier === 'bottomTier'" class="e-header-cell-label e-gantt-top-cell-text" :style="{
width: '100%',backgroundColor: bgColor(data.value, data.date),textAlign: 'center',height: '100%',
display: 'flex',alignItems: 'center',fontWeight: 'bold',justifyContent: 'center'}" title={{data.date}}>
{{ holidayValue(data.value, data.date) }}
</div>
</template>
</ejs-gantt>
</div>
</template>
<script setup>
import { GanttComponent as EjsGantt } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
const data = editingData;
const height = '450px';
const taskFields = {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
};
const timelineSettings = {
topTier: {
unit: 'Week',
format: 'dd/MM/yyyy'
},
bottomTier: {
unit: 'Day',
count: 1
},
timelineUnitSize: 100
};
const splitterSettings = {
columnIndex: 1
};
const holidays = [{
from: "04/04/2019",
to: "04/05/2019",
label: " Public holidays",
cssClass: "e-custom-holiday"
},
{
from: "04/12/2019",
to: "04/12/2019",
label: " Public holiday",
cssClass: "e-custom-holiday"
}];
const labelSettings = {
leftLabel: 'TaskName',
taskLabel: 'Progress'
};
const columns = [
{ field: 'TaskID', headerText: 'Task ID', visible: false },
{ field: 'TaskName', headerText: 'Task Name', width: 300 },
{ field: 'StartDate', headerText: 'Start Date' },
{ field: 'Duration', headerText: 'Duration' },
{ field: 'Progress', headerText: 'Progress' },
];
const imagedate = () => {
// Define the logic for image source
const getImage = Math.floor(Math.random() * 5) + 1;
return "./images/" + getImage + ".svg";
}
const bgColor = (value, date) => {
// Define the logic to determine background color
if (value === "S") {
return "#7BD3EA"
}
const parsedDate = new Date(date);
for (let i = 0; i < this.$refs.gantt.ej2Instances.holidays.length; i++) {
const holiday = this.$refs.gantt.ej2Instances.holidays[i];
const fromDate = new Date(holiday.from);
const toDate = new Date(holiday.to)
if (parsedDate >= fromDate && parsedDate <= toDate) {
return "#97E7E1";
}
}
return "#E0FBE2"
}
const holidayValue = (value, date) => {
// Define the logic to determine holiday value
const parsedDate = new Date(date);
for (let i = 0; i < this.$refs.gantt.ej2Instances.holidays.length; i++) {
const holiday = this.$refs.gantt.ej2Instances.holidays[i];
const fromDate = new Date(holiday.from);
const toDate = new Date(holiday.to)
if (parsedDate >= fromDate && parsedDate <= toDate) {
const options = { weekday: 'short' };
return parsedDate.toLocaleDateString('en-US', options).toLocaleUpperCase();
}
}
return value
}
</script><template>
<div>
<ejs-gantt ref='gantt' :dataSource="data" id="GanttContainer" :taskFields="taskFields" :treeColumnIndex="1"
:holidays="holidays" :labelSettings="labelSettings" :splitterSettings="splitterSettings" :height="height"
:columns="columns" :timelineSettings="timelineSettings" :timelineTemplate="'timelineTemplates'">
<template v-slot:timelineTemplates="{ data }">
<div v-if="data.tier == 'topTier'" class="e-header-cell-label e-gantt-top-cell-text"
style="width:100%;background-color: #FBF9F1 ; font-weight: bold;height: 100%;display: flex; justify-content: center ; align-items: center; "
title={{data.date}}>
<div> {{data.value }}</div>
<div style="width:20px; height: 20px; line-height: normal; padding-left: 10px; ">
<img :style="{ width: '100%', height: '100%' }" :src="imagedate()">
</div>
</div>
<div v-else-if="data.tier === 'bottomTier'" class="e-header-cell-label e-gantt-top-cell-text" :style="{
width: '100%',backgroundColor: bgColor(data.value, data.date),textAlign: 'center',height: '100%',
display: 'flex',alignItems: 'center',fontWeight: 'bold',justifyContent: 'center'}" title={{data.date}}>
{{ holidayValue(data.value, data.date) }}
</div>
</template>
</ejs-gantt>
</div>
</template>
<script>
import { GanttComponent, DayMarkers, Selection } from "@syncfusion/ej2-vue-gantt";
import { editingData } from './data-source.js';
export default {
name: "App",
components: {
"ejs-gantt": GanttComponent
},
data: function () {
return {
data: editingData,
allowSorting: true,
taskFields: {
id: 'TaskId',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
parentID: 'ParentId',
},
splitterSettings: {
columnIndex: 1
},
treeColumnIndex: 1,
allowSelection: true,
gridLines: "Both",
showColumnMenu: false,
highlightWeekends: true,
timelineSettings: {
topTier: {
unit: 'Week',
format: 'dd/MM/yyyy'
},
bottomTier: {
unit: 'Day',
count: 1
},
timelineUnitSize: 100
},
holidays: [{
from: "04/04/2019",
to: "04/05/2019",
label: " Public holidays",
cssClass: "e-custom-holiday"
},
{
from: "04/12/2019",
to: "04/12/2019",
label: " Public holiday",
cssClass: "e-custom-holiday"
}],
columns: [
{ field: 'TaskID', headerText: 'Task ID', visible: false },
{ field: 'TaskName', headerText: 'Task Name', width: 300 },
{ field: 'StartDate', headerText: 'Start Date' },
{ field: 'Duration', headerText: 'Duration' },
{ field: 'Progress', headerText: 'Progress' },
],
labelSettings: {
leftLabel: 'TaskName',
taskLabel: 'Progress'
},
height: '550px',
allowUnscheduledTasks: true,
};
},
provide: {
gantt: [DayMarkers, Selection]
},
methods: {
imagedate() {
// Define the logic for image source
const getImage = Math.floor(Math.random() * 5) + 1;
return "./images/" + getImage + ".svg";
},
bgColor(value, date) {
// Define the logic to determine background color
if (value === "S") {
return "#7BD3EA"
}
const parsedDate = new Date(date);
for (let i = 0; i < this.$refs.gantt.ej2Instances.holidays.length; i++) {
const holiday = this.$refs.gantt.ej2Instances.holidays[i];
const fromDate = new Date(holiday.from);
const toDate = new Date(holiday.to)
if (parsedDate >= fromDate && parsedDate <= toDate) {
return "#97E7E1";
}
}
return "#E0FBE2"
},
holidayValue(value, date) {
// Define the logic to determine holiday value
const parsedDate = new Date(date);
for (let i = 0; i < this.$refs.gantt.ej2Instances.holidays.length; i++) {
const holiday = this.$refs.gantt.ej2Instances.holidays[i];
const fromDate = new Date(holiday.from);
const toDate = new Date(holiday.to)
if (parsedDate >= fromDate && parsedDate <= toDate) {
const options = { weekday: 'short' };
return parsedDate.toLocaleDateString('en-US', options).toLocaleUpperCase();
}
}
return value
}
}
};
</script>