Cell Selection in Vue Gantt Chart Component

3 Feb 202624 minutes to read

You can select a cell in the Gantt Chart component by setting the https://ej2.syncfusion.com/vue/documentation/api/gantt/selectionSettings#mode property to cell. You can get the selected cell information using the https://ej2.syncfusion.com/vue/documentation/api/gantt/selection#getselectedrowcellindexes method. This method returns the result as an object collection, which contains the cellIndexes and rowIndex information of the selected cells.

Refer to the following code example to enable cell selection in Gantt.

<template>
     <div>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script setup>
import { provide } from "vue";
import { GanttComponent as EjsGantt, Selection } from "@syncfusion/ej2-vue-gantt";
const data = [
    {
        TaskID: 1,
        TaskName: 'Project Initiation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
            { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
            { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
        ]
    },
    {
        TaskID: 5,
        TaskName: 'Project Estimation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
        ]
    },
];
const height = '450px';
const taskFields = {
    id: 'TaskID',
    name: 'TaskName',
    startDate: 'StartDate',
    endDate: 'EndDate',
    duration: 'Duration',
    progress: 'Progress',
    dependency: 'Predecessor',
    child: 'subtasks'
};
const selectionSettings = {
    mode: 'Cell'
}
provide('gantt',  [ Selection ]);
</script>
<template>
     <div>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script>

import { GanttComponent, Selection } from "@syncfusion/ej2-vue-gantt";
export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
  data: function() {
      return{
            data: [
            {
                TaskID: 1,
                TaskName: 'Project Initiation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                    { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
                    { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                ]
            },
            {
                TaskID: 5,
                TaskName: 'Project Estimation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
                ]
            },
        ],
            height: '450px',
            taskFields: {
                id: 'TaskID',
                name: 'TaskName',
                startDate: 'StartDate',
                endDate: 'EndDate',
                duration: 'Duration',
                progress: 'Progress',
                dependency: 'Predecessor',
                child: 'subtasks'
            },
            selectionSettings: {
                mode: 'Cell'
            }
      };
  },
  provide: {
      gantt: [ Selection ]
  }
};
</script>

Selecting multiple cells

You can select multiple cells by setting the https://ej2.syncfusion.com/vue/documentation/api/gantt/selectionSettings#type property to multiple and the https://ej2.syncfusion.com/vue/documentation/api/gantt/selectionSettings#mode property to cell. Multiple cells can be selected by holding the CTRL key and selecting the cells. The following code example demonstrates how to select multiple cells.

<template>
     <div>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script setup>
import { provide } from "vue";
import { GanttComponent as EjsGantt, Selection } from "@syncfusion/ej2-vue-gantt";
const data = [
    {
        TaskID: 1,
        TaskName: 'Project Initiation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
            { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
            { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
        ]
    },
    {
        TaskID: 5,
        TaskName: 'Project Estimation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
        ]
    },
];
const height = '450px';
const taskFields = {
    id: 'TaskID',
    name: 'TaskName',
    startDate: 'StartDate',
    endDate: 'EndDate',
    duration: 'Duration',
    progress: 'Progress',
    dependency: 'Predecessor',
    child: 'subtasks'
};
const selectionSettings = {
    mode: 'Cell'
}
provide('gantt',  [ Selection ]);
</script>
<template>
     <div>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script>

import { GanttComponent, Selection } from "@syncfusion/ej2-vue-gantt";

export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
  data: function() {
      return{
            data: [
            {
                TaskID: 1,
                TaskName: 'Project Initiation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                    { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
                    { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                ]
            },
            {
                TaskID: 5,
                TaskName: 'Project Estimation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
                ]
            },
        ],
            height: '450px',
            taskFields: {
                id: 'TaskID',
                name: 'TaskName',
                startDate: 'StartDate',
                endDate: 'EndDate',
                duration: 'Duration',
                progress: 'Progress',
                dependency: 'Predecessor',
                child: 'subtasks'
            },
            selectionSettings: {
                mode: 'Cell',
                type: 'Multiple'
            }
      };
  },
  provide: {
      gantt: [ Selection ]
  }
};
</script>

Selecting a cell dynamically

You can select a cell dynamically using the https://ej2.syncfusion.com/vue/documentation/api/gantt/selection#selectcell method. Refer to the following code example for details.

<template>
     <div>
        <ejs-button id="selectCell" cssClass="e-info" v-on:click="select">Select Cell</ejs-button>
        <br>
        <br>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height ="height" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script setup>
import { provide, ref } from "vue";
import { GanttComponent as EjsGantt, Selection } from "@syncfusion/ej2-vue-gantt";
import { ButtonComponent as EjsButton } from "@syncfusion/ej2-vue-buttons";

const gantt = ref(null);
const data = [
    {
        TaskID: 1,
        TaskName: 'Project Initiation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
            { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
            { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
        ]
    },
    {
        TaskID: 5,
        TaskName: 'Project Estimation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
        ]
    },
];
const height = '450px';
const taskFields = {
    id: 'TaskID',
    name: 'TaskName',
    startDate: 'StartDate',
    endDate: 'EndDate',
    duration: 'Duration',
    progress: 'Progress',
    dependency: 'Predecessor',
    child: 'subtasks'
};
const selectionSettings = {
    mode: 'Cell'
}
const select = function(e){
    var ganttObj = gantt.value.ej2Instances;
    ganttObj.selectionModule.selectCell({ cellIndex: 1, rowIndex: 1 });
}
provide('gantt',  [ Selection ]);
</script>
<template>
     <div>
        <ejs-button id="selectCell" cssClass="e-info" v-on:click="select">Select Cell</ejs-button>
        <br>
        <br>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height ="height" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script>

import { GanttComponent, Selection } from "@syncfusion/ej2-vue-gantt";
import { ButtonComponent } from "@syncfusion/ej2-vue-buttons";
export default {
name: "App",
components: {
"ejs-button":ButtonComponent,
"ejs-gantt":GanttComponent
},
  data: function() {
      return{
            data: [
            {
                TaskID: 1,
                TaskName: 'Project Initiation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                    { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
                    { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                ]
            },
            {
                TaskID: 5,
                TaskName: 'Project Estimation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
                ]
            },
        ],
            height: '450px',
            taskFields: {
                id: 'TaskID',
                name: 'TaskName',
                startDate: 'StartDate',
                endDate: 'EndDate',
                duration: 'Duration',
                progress: 'Progress',
                dependency: 'Predecessor',
                child: 'subtasks'
            },
            selectionSettings: {
                mode: 'Cell'
            }
      };
  },
  provide: {
      gantt: [ Selection ]
  },
  methods: {
      select: function(e){
          var ganttObj = document.getElementById('GanttContainer').ej2_instances[0];
          ganttObj.selectionModule.selectCell({ cellIndex: 1, rowIndex: 1 });
      },
  }
};
</script>

Customize cell selection action

While selecting a cell in Gantt, the https://ej2.syncfusion.com/vue/documentation/api/gantt#cellselecting and https://ej2.syncfusion.com/vue/documentation/api/gantt#cellselected events will be triggered. The cellSelecting event will be triggered at the initialization of the cell selection action, and you can get the currently selecting cell information to prevent the selection of a particular cell in a particular row. The cellSelected event will be triggered upon completion of the cell selection action, and you can get the currently selected cell’s information. The following code example demonstrates how to prevent the selection of a cell using the cellSelecting event.

<template>
     <div>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :cellSelecting="cellSelecting" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script setup>
import { provide } from "vue";
import { GanttComponent as EjsGantt, Selection } from "@syncfusion/ej2-vue-gantt";
const data = [
    {
        TaskID: 1,
        TaskName: 'Project Initiation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
            { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
            { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
        ]
    },
    {
        TaskID: 5,
        TaskName: 'Project Estimation',
        StartDate: new Date('04/02/2019'),
        EndDate: new Date('04/21/2019'),
        subtasks: [
            { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
            { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
        ]
    },
];
const height = '450px';
const taskFields = {
    id: 'TaskID',
    name: 'TaskName',
    startDate: 'StartDate',
    endDate: 'EndDate',
    duration: 'Duration',
    progress: 'Progress',
    dependency: 'Predecessor',
    child: 'subtasks'
};
const cellSelecting = function (args) {
    if (args.data.TaskID == 4 && args.cellIndex.cellIndex == 1) {
        args.cancel = true;
    }
};
const selectionSettings = {
    mode: 'Cell'
}
provide('gantt',  [ Selection ]);
</script>
<template>
     <div>
        <ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :cellSelecting="cellSelecting" :selectionSettings="selectionSettings"></ejs-gantt>
    </div>
</template>
<script>

import { GanttComponent, Selection } from "@syncfusion/ej2-vue-gantt";

export default {
name: "App",
components: {
"ejs-gantt":GanttComponent
},
  data: function() {
      return{
            data: [
            {
                TaskID: 1,
                TaskName: 'Project Initiation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    {  TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                    { TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50  },
                    { TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
                ]
            },
            {
                TaskID: 5,
                TaskName: 'Project Estimation',
                StartDate: new Date('04/02/2019'),
                EndDate: new Date('04/21/2019'),
                subtasks: [
                    { TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
                    { TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
                ]
            },
        ],
            height: '450px',
            taskFields: {
                id: 'TaskID',
                name: 'TaskName',
                startDate: 'StartDate',
                endDate: 'EndDate',
                duration: 'Duration',
                progress: 'Progress',
                dependency: 'Predecessor',
                child: 'subtasks'
            },
            cellSelecting: function (args) {
                if (args.data.TaskID == 4 && args.cellIndex.cellIndex == 1) {
                    args.cancel = true;
                }
            },
            selectionSettings: {
                mode: 'Cell'
            }
      };
  },
  provide: {
      gantt: [ Selection ]
  }
};
</script>

Limitations for cell selection

  • Cell-based selection is not supported when virtualization is enabled.