Filtering allows you to view specific or related records based on filter criteria. This can be done in the Gantt Component by using the filter menu support and toolbar search support. To enable filtering in the Gantt Component, set the allowFiltering
to true
. Menu filtering support can be configured using the filterSettings
property and toolbar searching can be configured using the searchSettings
property.
To use the filter, inject the Filter
module in the provide
section.
The Gantt Component provides the menu filtering support for each column. You can enable the filter menu by setting the allowFiltering
to true
. The filter menu UI will be rendered based on its column type, which allows you to filter data. You can filter the records with different operators.
<template>
<div>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :columns="columns" :splitterSettings = "splitterSettings" :filterSettings="filterSettings" :allowFiltering= ""></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Filter, } from "@syncfusion/ej2-vue-gantt";
import { projectNewData } from './data-source.js';
Vue.use(GanttPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site location', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perform soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]}
]
}],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
splitterSettings:{
columnIndex:3
},
filterSettings: {
type:'Menu'
},
};
},
provide: {
gantt: [ Filter]
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
allowFiltering
must be set astrue
to enable filter menu. Settingcolumns.allowFiltering
asfalse
will prevent filter menu rendering for a particular column.
The Gantt supports a set of filtering modes with the filterSettings.hierarchyMode
property. The following are the types of filter hierarchy modes available in the Gantt component:
Parent
: This is the default filter hierarchy mode in Gantt. The filtered records are displayed with its parent records. If the filtered records do not have any parent record, then only the filtered records will be displayed.Child
: Displays the filtered records with its child record. If the filtered records do not have any child record, then only the filtered records will be displayed.Both
: Displays the filtered records with its both parent and child records. If the filtered records do not have any parent and child records, then only the filtered records will be displayed.None
: Displays only the filtered records.<template>
<div>
<table>
<tr>
<td style="width: 70%">
<ejs-dropdownlist id="filter-type" value='Parent' :dataSource="dataSource" :fields = "fields" :change ="change"> Filter Hierarchy </ejs-dropdownlist>
</td>
</tr>
</table>
<br> <br>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height="height" :columns="columns" :splitterSettings = "splitterSettings" :allowFiltering= "true"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Filter, Toolbar } from "@syncfusion/ej2-vue-gantt";
import { DropDownListPlugin } from "@syncfusion/ej2-vue-dropdowns";
import { projectNewData } from './data-source.js';
Vue.use(GanttPlugin);
Vue.use(DropDownListPlugin);
export default {
data: function() {
return{
data: projectNewData,
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
splitterSettings:{
columnIndex:3
},
dataSource: [
{ id: 'Parent', mode: 'Parent' },
{ id: 'Child', mode: 'Child' },
{ id: 'Both', mode: 'Both' },
{ id: 'None', mode: 'None' },
],
fields: { text: 'mode', value: 'id' },
};
},
provide: {
gantt: [ Filter ]
},
methods: {
change: function (e) {
var ganttChart = document.getElementById('GanttContainer').ej2_instances[0];
var mode = e.value;
ganttChart.filterSettings.hierarchyMode = mode;
ganttChart.clearFiltering();
}
},
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
To apply the filter at initial rendering, set the filter to predicate object in the filterSettings.columns
property.
<template>
<div>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :columns="columns" :splitterSettings = "splitterSettings" :filterSettings="filterSettings" :allowFiltering= "true"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Filter } from "@syncfusion/ej2-vue-gantt";
Vue.use(GanttPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site location', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perform soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]
}
]
}];
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
splitterSettings:{
columnIndex:3
},
filterSettings: {
columns: [{ field: 'TaskName', matchCase: false, operator: 'startswith', predicate: 'and', value: 'Identify' },
{ field: 'TaskID', matchCase: false, operator: 'equal', predicate: 'and', value: 2 }]
},
};
},
provide: {
gantt: [ Filter ]
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
The filter operator for a column can be defined in the filterSettings.columns.operator
property.
The available operators and its supported data types are:
Operator | Description | Supported Types |
---|---|---|
startswith | Checks whether the value begins with the specified value. | String |
endswith | Checks whether the value ends with the specified value. | String |
contains | Checks whether the value contains the specified value. | String |
equal | Checks whether the value is equal to the specified value. | String | Number | Boolean | Date |
notequal | Checks for values not equal to the specified value. | String | Number | Boolean | Date |
greaterthan | Checks whether the value is greater than the specified value. | Number | Date |
greaterthanorequal | Checks whether a value is greater than or equal to the specified value. | Number | Date |
lessthan | Checks whether the value is less than the specified value. | Number | Date |
lessthanorequal | Checks whether the value is less than or equal to the specified value. | Number | Date |
By default, the
filterSettings.columns.operator
value isequal
.
By default, the Gantt component ignores the diacritic characters while filtering. To include diacritic characters, set the filterSettings.ignoreAccent
to true
.
In the following sample, type Project in the TaskName
column to filter diacritic characters.
<template>
<div>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :columns="columns" :splitterSettings = "splitterSettings" :filterSettings="filterSettings" :allowFiltering= "true"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Filter } from "@syncfusion/ej2-vue-gantt";
import { projectNewData } from './data-source.js';
Vue.use(GanttPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Projéct initiàtion',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site locàtion', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perförm soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil tëst appröval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develöp floor plan for estimàtion', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List matërials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]
}
]
}],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
splitterSettings:{
columnIndex:3
},
filterSettings: {
ignoreAccent:true
},
};
},
provide: {
gantt: [ Filter ]
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
You can filter the columns dynamically by using the filterByColumn
method.
<template>
<div>
<ejs-button id="filterRecord" cssClass="e-info" v-on:click.native="filter">Filter</ejs-button>
<br><br><br>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :splitterSettings = "splitterSettings" :columns="columns" :allowFiltering= "true"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Filter } from "@syncfusion/ej2-vue-gantt";
import { ButtonPlugin } from "@syncfusion/ej2-vue-buttons";
import { projectNewData } from './data-source.js';
Vue.use(GanttPlugin);
Vue.use(ButtonPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
]
},
],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
splitterSettings:{
columnIndex:3
},
};
},
provide: {
gantt: [ Filter ]
},
methods: {
filter: function(e){
var ganttObj = document.getElementById('GanttContainer').ej2_instances[0];
ganttObj.filterByColumn('TaskName','startswith','Iden','and');
}
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
You can clear all the filtering condition done in the Gantt component by using the clearFiltering
method.
The following code snippet explains the above behavior.
<template>
<div>
<ejs-button id="ClearfilterRecord" cssClass="e-info" v-on:click.native="filter">Clear Filter</ejs-button>
<br><br><br>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :columns="columns" :splitterSettings = "splitterSettings" :filterSettings="filterSettings" :allowFiltering= "true"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Filter } from "@syncfusion/ej2-vue-gantt";
import { ButtonPlugin } from "@syncfusion/ej2-vue-buttons";
import { projectNewData } from './data-source.js';
Vue.use(GanttPlugin);
Vue.use(ButtonPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 4, Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 },
{ TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'), Duration: 3, Progress: 50 }
]
},
],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
splitterSettings:{
columnIndex:3
},
filterSettings: {
columns: [{ field: 'TaskName', matchCase: false, operator: 'startswith', predicate: 'and', value: 'Identify' },
{ field: 'Progress', matchCase: false, operator: 'equal', predicate: 'and', value: 50 }]
}
};
},
provide: {
gantt: [ Filter ]
},
methods: {
filter: function(e){
var ganttObj = document.getElementById('GanttContainer').ej2_instances[0];
ganttObj.clearFiltering();
}
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
You can search records in the Gantt component by using the search
method with search key as a parameter. The Gantt component provides an option to integrate the search text box in the toolbar by adding the search item to the toolbar
property.
To search records, inject the Filter
module in the provide
section.
<template>
<div>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :splitterSettings = "splitterSettings" :toolbar="toolbar"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Toolbar, Filter } from "@syncfusion/ej2-vue-gantt";
Vue.use(GanttPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site location', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perform soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]}
]
}],
height: '450px',
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
endDate: 'EndDate',
duration: 'Duration',
progress: 'Progress',
dependency: 'Predecessor',
child: 'subtasks'
},
toolbar: ['Search'],
splitterSettings:{
columnIndex:3
},
};
},
provide: {
gantt: [ Toolbar, Filter ]
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
In the Gantt component, you can load a task with some search criteria and this can be done by using the searchSettings
property.
To apply search at initial rendering, set the value for fields
, operator
, key
, and ignoreCase
in the searchSettings
property.
<template>
<div>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :splitterSettings = "splitterSettings" :columns="columns" :toolbar="toolbar" :searchSettings="searchSettings"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Toolbar, Filter } from "@syncfusion/ej2-vue-gantt";
Vue.use(GanttPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site location', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perform soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]}
]
}],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
toolbar: ['Search'],
splitterSettings:{
columnIndex:3
},
searchSettings: { fields: ['TaskName'], operator: 'contains', key: 'List', ignoreCase: true } };
},
provide: {
gantt: [ Toolbar, Filter ]
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
By default, Gantt searches all the bound column values. To customize this behavior, define the
searchSettings.fields
property.
The search operator can be defined in the searchSettings.operator
property to configure specific searching.
The following operators are supported in searching:
Operator | Description |
---|---|
startsWith | Checks whether a value begins with the specified value. |
endsWith | Checks whether a value ends with the specified value. |
contains | Checks whether a value contains the specified value. |
equal | Checks whether a value is equal to the specified value. |
notEqual | Checks for values not equal to the specified value. |
By default, the
searchSettings.operator
value iscontains
.
To search the Gantt records from an external button, invoke the search
method.
<template>
<div>
<ejs-button id="searchRecord" cssClass="e-info" v-on:click.native="search">Search</ejs-button>
<br><br><br>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :toolbar="toolbar" :splitterSettings = "splitterSettings" :columns="columns" :allowFiltering='true'></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Toolbar, Filter } from "@syncfusion/ej2-vue-gantt";
import { ButtonPlugin } from "@syncfusion/ej2-vue-buttons";
Vue.use(GanttPlugin);
Vue.use(ButtonPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site location', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perform soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]}
]
}],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
toolbar: ['Search'],
splitterSettings:{
columnIndex:3
},
};
},
provide: {
gantt: [ Toolbar, Filter ]
},
methods: {
search: function(e){
var ganttObj = document.getElementById('GanttContainer').ej2_instances[0];
var searchText = document.getElementById('GanttContainer_searchbar').value;
ganttObj.search(searchText);
}
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
Note: You should set the allowFiltering
property to true
for searching the content externally.
By default, the Gantt component searches all the columns. You can search specific columns by defining the specific column’s field names in the searchSettings.fields
property.
<template>
<div>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :toolbar="toolbar" :splitterSettings = "splitterSettings" :columns="columns" :searchSettings="searchSettings"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Toolbar, Filter } from "@syncfusion/ej2-vue-gantt";
Vue.use(GanttPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site location', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perform soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]}
]
}],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
toolbar: ['Search'],
searchSettings: { fields: ['TaskName', 'Duration'] },
splitterSettings:{
columnIndex:3
},
};
},
provide: {
gantt: [ Toolbar, Filter ]
},
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});
In above sample, you can search only
TaskName
andDuration
column values.
You can set searchSettings.key
property as empty
string, to clear the searched Gantt records from external button.
<template>
<div>
<ejs-button id="clearSearch" cssClass="e-info" v-on:click.native="clearSearch">Clear Search</ejs-button>
<br><br><br>
<ejs-gantt ref='gantt' id="GanttContainer" :dataSource="data" :taskFields = "taskFields" :height = "height" :splitterSettings = "splitterSettings" :columns="columns" :toolbar="toolbar" :searchSettings="searchSettings"></ejs-gantt>
</div>
</template>
<script>
import Vue from "vue";
import { GanttPlugin, Toolbar, Filter } from "@syncfusion/ej2-vue-gantt";
import { ButtonPlugin } from "@syncfusion/ej2-vue-buttons";
Vue.use(GanttPlugin);
Vue.use(ButtonPlugin);
export default {
data: function() {
return{
data: [
{
TaskID: 1,
TaskName: 'Project initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 2, TaskName: 'Identify site location', StartDate: new Date('04/02/2019'), Duration: 0,Progress: 50, resources: [1]},
{TaskID: 3, TaskName: 'Perform soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',Progress: 50, resources: [2, 3, 5]},
{TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 50 },
]
},
{
TaskID: 5,
TaskName: 'Project estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '4', Progress: 50, resources: [4]},
{TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),Duration: 3, Predecessor: '6', resources: [4, 8],Progress: 50},
{TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),Duration: 0, Predecessor: '7', resources: [12, 5]}
]
}],
height: '450px',
columns: [
{ field: 'TaskID', headerText: 'Task ID', textAlign: 'Left', width: '100' },
{ field: 'TaskName', headerText: 'Task Name', width: '250' },
{ field: 'StartDate', headerText: 'Start Date', width: '150' },
{ field: 'Duration', headerText: 'Duration', width: '150' },
{ field: 'Progress', headerText: 'Progress', width: '150' },
],
taskFields: {
id: 'TaskID',
name: 'TaskName',
startDate: 'StartDate',
duration: 'Duration',
progress: 'Progress',
child: 'subtasks'
},
toolbar: ['Search'],
splitterSettings:{
columnIndex:3
},
searchSettings: { fields: ['TaskName'], operator: 'contains', key: 'Perform', ignoreCase: true } };
},
provide: {
gantt: [ Toolbar, Filter ]
},
methods: {
clearSearch: function(e){
var ganttObj = document.getElementById('GanttContainer').ej2_instances[0];
ganttObj.searchSettings.key='';
}
}
};
</script>
define(["require", "exports"], function (require, exports) {
"use strict";
Object.defineProperty(exports, "__esModule", { value: true });
exports.projectNewData = [
{
TaskID: 1,
TaskName: 'Product Concept',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Defining the product and its usage', StartDate: new Date('04/02/2019'), Duration: 3, Progress: 30 },
{ TaskID: 3, TaskName: 'Defining target audience', StartDate: new Date('04/02/2019'), Duration: 3 },
{
TaskID: 4, TaskName: 'Prepare product sketch and notes', StartDate: new Date('04/02/2019'), Duration: 2,
Predecessor: '2', Progress: 30
},
]
},
{
TaskID: 5, TaskName: 'Concept Approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3,4',
Indicators: [
{
'date': '04/10/2019',
'name': '#briefing',
'title': 'Product concept breifing',
}
]
},
{
TaskID: 6,
TaskName: 'Market Research',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 7,
TaskName: 'Demand Analysis',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 8, TaskName: 'Customer strength', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '5', Progress: 30
},
{ TaskID: 9, TaskName: 'Market opportunity analysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '5' }
]
},
{
TaskID: 10, TaskName: 'Competitor Analysis', StartDate: new Date('04/04/2019'), Duration: 4,
Predecessor: '7, 8', Progress: 30
},
{ TaskID: 11, TaskName: 'Product strength analsysis', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '9' },
{
TaskID: 12, TaskName: 'Research complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '10',
Indicators: [
{
'date': '04/20/2019',
'name': '#meeting',
'title': '1st board of directors meeting',
}
]
}
]
},
{
TaskID: 13,
TaskName: 'Product Design and Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 14, TaskName: 'Functionality design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '12'
},
{ TaskID: 15, TaskName: 'Quality design', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '12' },
{ TaskID: 16, TaskName: 'Define Reliability', StartDate: new Date('04/04/2019'), Duration: 2, Progress: 30, Predecessor: '15' },
{ TaskID: 17, TaskName: 'Identifying raw materials', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '15' },
{
TaskID: 18,
TaskName: 'Define cost plan',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 19, TaskName: 'Manufacturing cost', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '17'
},
{ TaskID: 20, TaskName: 'Selling cost', StartDate: new Date('04/04/2019'), Duration: 2, Predecessor: '17' }
]
},
{
TaskID: 21,
TaskName: 'Development of the final design',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 22, TaskName: 'Defining dimensions and package volume', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '19,20'
},
{
TaskID: 23, TaskName: 'Develop design to meet industry standards', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '22'
},
{ TaskID: 24, TaskName: 'Include all the details', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '23' }
]
},
{
TaskID: 25, TaskName: 'CAD Computer-aided design', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '24'
},
{ TaskID: 26, TaskName: 'CAM Computer-aided manufacturing', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '25' },
{
TaskID: 27, TaskName: 'Design complete', StartDate: new Date('04/04/2019'), Duration: 0, Predecessor: '26',
Indicators: [
{
'date': '05/18/2019',
'name': '#meeting',
'title': '2nd board of directors meeting',
}
]
}
]
},
{ TaskID: 28, TaskName: 'Prototype Testing', StartDate: new Date('04/04/2019'), Duration: 4, Progress: 30, Predecessor: '27' },
{ TaskID: 29, TaskName: 'Include feedback', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '28ss' },
{ TaskID: 30, TaskName: 'Manufacturing', StartDate: new Date('04/04/2019'), Duration: 5, Progress: 30, Predecessor: '28,29' },
{ TaskID: 31, TaskName: 'Assembling materials to finsihed goods', StartDate: new Date('04/04/2019'), Duration: 5, Predecessor: '30' },
{
TaskID: 32,
TaskName: 'Feedback and Testing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Internal testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 45, Predecessor: '31'
},
{
TaskID: 34, TaskName: 'Customer testing and feedback', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 50, Predecessor: '33'
}
]
},
{
TaskID: 35,
TaskName: 'Final Product Development',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 36, TaskName: 'Important improvements', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '34'
},
{
TaskID: 37, TaskName: 'Address any unforeseen issues', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '36ss'
}
]
},
{
TaskID: 38,
TaskName: 'Final Product',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{ TaskID: 39, TaskName: 'Branding product', StartDate: new Date('04/04/2019'), Duration: 4, Predecessor: '37' },
{
TaskID: 40, TaskName: 'Marketing and presales', StartDate: new Date('04/04/2019'),
Duration: 4, Progress: 30, Predecessor: '39'
}
]
}
];
exports.editingResources = [
{ resourceId: 1, resourceName: 'Martin Tamer' },
{ resourceId: 2, resourceName: 'Rose Fuller' },
{ resourceId: 3, resourceName: 'Margaret Buchanan' },
{ resourceId: 4, resourceName: 'Fuller King' },
{ resourceId: 5, resourceName: 'Davolio Fuller' },
{ resourceId: 6, resourceName: 'Van Jack' },
{ resourceId: 7, resourceName: 'Fuller Buchanan' },
{ resourceId: 8, resourceName: 'Jack Davolio' },
{ resourceId: 9, resourceName: 'Tamer Vinet' },
{ resourceId: 10, resourceName: 'Vinet Fuller' },
{ resourceId: 11, resourceName: 'Bergs Anton' },
{ resourceId: 12, resourceName: 'Construction Supervisor' }
];
exports.editingData = [
{
TaskID: 1,
TaskName: 'Project Initiation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 2, TaskName: 'Identify Site location', StartDate: new Date('04/02/2019'), Duration: 0,
Progress: 30, resources: [1], info: 'Measure the total property area alloted for construction'
},
{
TaskID: 3, TaskName: 'Perform Soil test', StartDate: new Date('04/02/2019'), Duration: 4, Predecessor: '2',
resources: [2, 3, 5], info: 'Obtain an engineered soil test of lot where construction is planned.' +
'From an engineer or company specializing in soil testing'
},
{ TaskID: 4, TaskName: 'Soil test approval', StartDate: new Date('04/02/2019'), Duration: 0, Predecessor: '3', Progress: 30 },
]
},
{
TaskID: 5,
TaskName: 'Project Estimation',
StartDate: new Date('04/02/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 6, TaskName: 'Develop floor plan for estimation', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '4', Progress: 30, resources: 4,
info: 'Develop floor plans and obtain a materials list for estimations'
},
{
TaskID: 7, TaskName: 'List materials', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '6', resources: [4, 8], info: ''
},
{
TaskID: 8, TaskName: 'Estimation approval', StartDate: new Date('04/04/2019'),
Duration: 0, Predecessor: '7', resources: [12, 5], info: ''
}
]
},
{
TaskID: 9, TaskName: 'Sign Contract', StartDate: new Date('04/04/2019'), Duration: 1,
Predecessor: '8', Progress: 30, resources: [12],
info: 'If required obtain approval from HOA (homeowners association) or ARC (architectural review committee)'
},
{
TaskID: 10,
TaskName: 'Project Approval and kick off',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
Duration: 0,
Predecessor: '9'
},
{
TaskID: 11,
TaskName: 'Site Work',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 12, TaskName: 'Clear the building site', StartDate: new Date('04/04/2019'),
Duration: 2, Progress: 30, Predecessor: '9', resources: [6, 7],
info: 'Clear the building site (demolition of existing home if necessary)'
},
{
TaskID: 13, TaskName: 'Install temporary power service', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '12', resources: [6, 7], info: ''
},
]
},
{
TaskID: 14,
TaskName: 'Foundation',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 15, TaskName: 'Excavate for foundations', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '13', resources: [2, 8],
info: 'Excavate the foundation and dig footers (Scope of work is dependent of foundation designed by engineer)'
},
{
TaskID: 16, TaskName: 'Dig footer', StartDate: new Date('04/04/2019'),
Duration: 2, Predecessor: '15FF', resources: [8], info: ''
},
{
TaskID: 17, TaskName: 'Install plumbing grounds', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '15', resources: [9], info: ''
},
{
TaskID: 18, TaskName: 'Pour a foundation and footer with concrete', StartDate: new Date('04/04/2019'),
Duration: 1, Predecessor: '17', resources: [8, 9, 10], info: ''
},
{
TaskID: 19, TaskName: 'Cure basement walls', StartDate: new Date('04/04/2019'), Duration: 4,
Progress: 30, Predecessor: '18', resources: [10], info: ''
},
]
},
{
TaskID: 20,
TaskName: 'Framing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 21, TaskName: 'Add load-bearing structure', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '19', resources: [4, 5],
info: 'Build the main load-bearing structure out of thick pieces of wood and' +
'possibly metal I-beams for large spans with few supports'
},
{
TaskID: 22, TaskName: 'Install floor joists', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '21', resources: [2, 3], info: 'Add floor and ceiling joists and install subfloor panels'
},
{
TaskID: 23, TaskName: 'Add ceiling joists', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '22SS', resources: [5], info: ''
},
{
TaskID: 24, TaskName: 'Install subfloor panels', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '23', resources: [8, 9]
},
{
TaskID: 25, TaskName: 'Frame floor walls', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '24', resources: [10], info: ''
},
{
TaskID: 26, TaskName: 'Frame floor decking', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '25SS', resources: [4, 8], info: ''
},
]
},
{
TaskID: 27,
TaskName: 'Exterior finishing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 28, TaskName: 'Cover outer walls and roof in OSB', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '26', resources: [2, 8],
info: 'Cover outer walls and roof in OSB or plywood and a water-resistive barrier'
},
{
TaskID: 29, TaskName: 'Add water resistive barrier', StartDate: new Date('04/04/2019'),
Duration: 3, Predecessor: '28', resources: [1, 10],
info: 'Cover the walls with siding, typically vinyl, wood, or brick veneer but possibly stone or other materials'
},
{
TaskID: 30, TaskName: 'Install roof shingles', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '29', resources: [8, 9], info: 'Install roof shingles or other covering for flat roof'
},
{ TaskID: 31, TaskName: 'Install windows', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '29', resources: 7 },
]
},
{
TaskID: 32,
TaskName: 'Utilities',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 33, TaskName: 'Install internal plumbing', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '26', resources: [1, 10]
},
{
TaskID: 34, TaskName: 'Install HVAC', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '33',
resources: [4, 9], info: 'Add internal plumbing, HVAC, electrical, and natural gas utilities'
},
{
TaskID: 35, TaskName: 'Electrical utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '34'
},
{
TaskID: 36, TaskName: 'Natural gas utilities', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '35', resources: 11
},
{
TaskID: 37, TaskName: 'Install bathroom fixtures', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '35', resources: [3, 7]
},
],
info: 'Building inspector visits if necessary to approve utilities and framing'
},
{
TaskID: 38,
TaskName: 'Interior finsihing',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Install insulation', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '37', resources: [1, 8], info: 'Frame interior walls with wooden 2×4s'
},
{
TaskID: 40, TaskName: 'Install drywall panels', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '39', resources: 5,
info: 'Install insulation and interior drywall panels (cementboard for wet areas) and to complete walls and ceilings'
},
{
TaskID: 41, TaskName: 'Spackle', StartDate: new Date('04/04/2019'), Duration: 3,
Progress: 30, Predecessor: '40', resources: 10
},
{
TaskID: 42, TaskName: 'Apply primer', StartDate: new Date('04/04/2019'), Duration: 3,
Predecessor: '41', resources: [10, 11]
},
{
TaskID: 43, TaskName: 'Paint wall and ceilings', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '42', resources: [2, 9]
},
{
TaskID: 44, TaskName: 'Install modular kitchen', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '43', resources: [5, 7]
},
]
},
{
TaskID: 45,
TaskName: 'Flooring',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 46, TaskName: 'Tile kitchen, bathroom and entry walls', StartDate: new Date('04/04/2019'),
Duration: 3, Progress: 30, Predecessor: '44', resources: [4, 9, 3],
info: 'Additional tiling on top of cementboard for wet areas, such as the bathroom and kitchen backsplash'
},
{
TaskID: 47, TaskName: 'Tile floor', StartDate: new Date('04/04/2019'), Duration: 3, Predecessor: '46SS',
resources: [2, 8], info: 'Installation of final floor covering, such as floor tile, carpet, or wood flooring'
},
]
},
{
TaskID: 48,
TaskName: 'Final Acceptance',
StartDate: new Date('04/04/2019'),
EndDate: new Date('04/21/2019'),
subtasks: [
{
TaskID: 49, TaskName: 'Final inspection', StartDate: new Date('04/04/2019'), Duration: 2,
Progress: 30, Predecessor: '47', resources: 12, info: 'Ensure the contracted items'
},
{
TaskID: 50, TaskName: 'Cleanup for occupancy', StartDate: new Date('04/04/2019'), Duration: 2,
Predecessor: '49', resources: [1, 5], info: 'Installation of major appliances'
},
{
TaskID: 51, TaskName: 'Property Handover', StartDate: new Date('04/04/2019'), Duration: 0,
Predecessor: '50', info: 'Ending the contract'
},
]
},
];
exports.remoteData = [
{
TaskID: 1,
TaskName: 'Germination',
StartDate: new Date('03/01/2019'),
subtasks: [
{ TaskID: 2, TaskName: 'Dry seed (caryopsis)', StartDate: new Date('03/01/2019'), Duration: 0 },
{ TaskID: 3, TaskName: 'Seed imbibition complete', StartDate: new Date('03/01/2019'), Duration: 3, Predecessor: '2FS' },
{ TaskID: 4, TaskName: 'Radicle emerged from caryopsis', StartDate: new Date('03/04/2019'), Duration: 2, Predecessor: '3FS' },
{
TaskID: 5, TaskName: 'Coleoptile emerged from caryopsis', StartDate: new Date('03/06/2019'),
Duration: 2, Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'Emergence: coleoptile penetrates soil surface (cracking stage)',
StartDate: new Date('03/08/2019'), Duration: 2, Predecessor: '5FS'
},
]
},
{
TaskID: 7,
TaskName: 'Leaf development',
StartDate: new Date('03/10/2019'),
subtasks: [
{ TaskID: 8, TaskName: 'First leaf through coleoptile', StartDate: new Date('03/10/2019'), Duration: 1, Predecessor: '6FS' },
{ TaskID: 9, TaskName: 'First leaf unfolded', StartDate: new Date('03/11/2019'), Duration: 1, Predecessor: '8FS' },
{ TaskID: 10, TaskName: '3 leaves unfolded', StartDate: new Date('03/12/2019'), Duration: 2, Predecessor: '9FS' },
{ TaskID: 11, TaskName: '9 or more leaves unfolded', StartDate: new Date('03/14/2019'), Duration: 5, Predecessor: '10FS' },
]
},
{
TaskID: 12,
TaskName: 'Tillering',
StartDate: new Date('03/18/2019'),
subtasks: [
{
TaskID: 13, TaskName: 'Beginning of tillering: first tiller detectable',
StartDate: new Date('03/18/2019'), Duration: 0, Predecessor: '11FS'
},
{ TaskID: 14, TaskName: '2 tillers detectable', StartDate: new Date('03/19/2019'), Duration: 3, Predecessor: '13FS' },
{ TaskID: 15, TaskName: '3 tillers detectable', StartDate: new Date('03/22/2019'), Duration: 3, Predecessor: '14FS' },
{
TaskID: 16, TaskName: 'Maximum no. of tillers detectable', StartDate: new Date('03/25/2019'),
Duration: 6, Predecessor: '15FS'
},
{ TaskID: 17, TaskName: 'End of tillering', StartDate: new Date('03/30/2019'), Duration: 0, Predecessor: '16FS' },
]
},
{
TaskID: 18,
TaskName: 'Stem elongation',
StartDate: new Date('03/30/2019'),
subtasks: [
{
TaskID: 19,
TaskName: 'Beginning of stem elongation: pseudostem and tillers erect, first internode begins to elongate,' +
'top of inflorescence at least 1 cm above tillering node',
StartDate: new Date('03/30/2019'),
Duration: 0,
Predecessor: '17FS'
},
{
TaskID: 20, TaskName: 'First node at least 1 cm above tillering node', StartDate: new Date('03/31/2019'),
Duration: 1, Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Node 3 at least 2 cm above node 2', StartDate: new Date('04/01/2019'),
Duration: 2, Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Flag leaf just visible, still rolled', StartDate: new Date('04/03/2019'),
Duration: 4, Predecessor: '21FS'
},
{
TaskID: 23, TaskName: 'Flag leaf stage: flag leaf fully unrolled, ligule just visible', StartDate: new Date('04/07/2019'),
Duration: 2, Predecessor: '22FS'
},
]
},
{
TaskID: 24,
TaskName: 'Booting',
StartDate: new Date('04/09/2019'),
subtasks: [
{
TaskID: 25, TaskName: 'Early boot stage: flag leaf sheath extending', StartDate: new Date('04/09/2019'),
Duration: 2, Predecessor: '23FS'
},
{
TaskID: 26, TaskName: 'Mid boot stage: flag leaf sheath just visibly swollen', StartDate: new Date('04/11/2019'),
Duration: 2, Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'Late boot stage: flag leaf sheath swollen', StartDate: new Date('04/13/2019'),
Duration: 2, Predecessor: '26FS'
},
{ TaskID: 28, TaskName: 'Flag leaf sheath opening', StartDate: new Date('04/15/2019'), Duration: 2, Predecessor: '27FS' },
{
TaskID: 29, TaskName: 'First awns visible (in awned forms only)', StartDate: new Date('04/17/2019'),
Duration: 2, Predecessor: '28FS'
},
]
},
{
TaskID: 30,
TaskName: 'Inflorescence emergence, heading',
StartDate: new Date('04/18/2019'),
subtasks: [
{
TaskID: 31, TaskName: 'Beginning of heading: tip of inflorescence emerged from sheath, first spikelet just visible',
StartDate: new Date('04/18/2019'), Duration: 0, Predecessor: '29FS'
},
{ TaskID: 32, TaskName: '20% of inflorescence emerged', StartDate: new Date('04/19/2019'), Duration: 3, Predecessor: '31FS' },
{ TaskID: 33, TaskName: '40% of inflorescence emerged', StartDate: new Date('04/22/2019'), Duration: 2, Predecessor: '32FS' },
{
TaskID: 34, TaskName: 'Middle of heading: half of inflorescence emerged', StartDate: new Date('04/23/2019'),
Duration: 0, Predecessor: '33FS'
},
{ TaskID: 35, TaskName: '60% of inflorescence emerged', StartDate: new Date('04/24/2019'), Duration: 2, Predecessor: '34FS' },
{ TaskID: 36, TaskName: '80% of inflorescence emerged', StartDate: new Date('04/26/2019'), Duration: 3, Predecessor: '35FS' },
{
TaskID: 37, TaskName: 'End of heading: inflorescence fully emerged', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '36FS'
},
]
},
{
TaskID: 38,
TaskName: 'Flowering, anthesis',
StartDate: new Date('04/28/2019'),
subtasks: [
{
TaskID: 39, TaskName: 'Beginning of flowering: first anthers visible', StartDate: new Date('04/28/2019'),
Duration: 0, Predecessor: '37FS'
},
{
TaskID: 40, TaskName: 'Full flowering: 50% of anthers mature', StartDate: new Date('04/29/2019'),
Duration: 5, Predecessor: '39FS'
},
{
TaskID: 41, TaskName: 'spikelet have completed flowering', StartDate: new Date('05/04/2019'),
Duration: 5, Predecessor: '40FS'
},
{ TaskID: 42, TaskName: 'End of flowering', StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '41FS' },
]
},
{
TaskID: 43,
TaskName: 'Development of fruit',
StartDate: new Date('05/08/2019'),
subtasks: [
{
TaskID: 44, TaskName: 'Watery ripe: first grains have reached half their final size',
StartDate: new Date('05/08/2019'), Duration: 0, Predecessor: '42FS'
},
{ TaskID: 45, TaskName: 'Early milk', StartDate: new Date('05/09/2019'), Duration: 3, Predecessor: '44FS' },
{
TaskID: 46, TaskName: 'Medium milk: grain content milky, grains reached final size,still green',
StartDate: new Date('05/12/2019'), Duration: 3, Predecessor: '45FS'
},
{ TaskID: 47, TaskName: 'Late milk', StartDate: new Date('05/15/2019'), Duration: 2, Predecessor: '46FS' },
]
},
{
TaskID: 48,
TaskName: 'Ripening',
StartDate: new Date('05/17/2019'),
subtasks: [
{ TaskID: 49, TaskName: 'Early dough', StartDate: new Date('05/17/2019'), Duration: 6, Predecessor: '47FS' },
{
TaskID: 50, TaskName: 'Soft dough: grain content soft but dry. Fingernail impression not held',
StartDate: new Date('05/23/2019'), Duration: 2, Predecessor: '49FS'
},
{
TaskID: 51, TaskName: 'Hard dough: grain content solid. Fingernail impression held',
StartDate: new Date('05/25/2019'), Duration: 2, Predecessor: '50FS'
},
{
TaskID: 52, TaskName: 'Fully ripe: grain hard, difficult to divide with thumbnail',
StartDate: new Date('05/27/2019'), Duration: 2, Predecessor: '51FS'
},
]
},
{
TaskID: 53,
TaskName: 'Senescence',
StartDate: new Date('05/29/2019'),
subtasks: [
{
TaskID: 54, TaskName: 'Over-ripe: grain very hard, cannot be dented by thumbnail',
StartDate: new Date('05/29/2019'), Duration: 3, Predecessor: '52FS'
},
{ TaskID: 55, TaskName: 'Grains loosening in day-time', StartDate: new Date('06/01/2019'), Duration: 1, Predecessor: '54FS' },
{ TaskID: 56, TaskName: 'Plant dead and collapsing', StartDate: new Date('06/02/2019'), Duration: 4, Predecessor: '55FS' },
{ TaskID: 57, TaskName: 'Harvested product', StartDate: new Date('06/06/2019'), Duration: 2, Predecessor: '56FS' },
]
},
];
exports.filteredData = [
{
TaskID: 1,
TaskName: 'Launch and flight to lunar orbit',
StartDate: new Date('07/16/1969'),
subtasks: [
{
TaskID: 2, TaskName: 'Apollo 11 blasts off from launch pad', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:32:00 AM'), Duration: 0,
},
{
TaskID: 3, TaskName: 'Entry to Earth’s orbit', StartDate: new Date('07/16/1969 03:32:00 AM'),
EndDate: new Date('07/16/1969 03:44:00 AM'), Predecessor: '2FS'
},
{
TaskID: 4, TaskName: 'Travelling in earth’s orbit', StartDate: new Date('07/16/1969 03:44:00 AM'),
EndDate: new Date('07/16/1969 04:22:13 AM'), Predecessor: '3FS'
},
{
TaskID: 5, TaskName: 'Trajectory change toward the Moon', StartDate: new Date('07/16/1969 04:22:13 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '4FS'
},
{
TaskID: 6, TaskName: 'extraction maneuver performed', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:52:00 AM'), Predecessor: '5FS'
},
{
TaskID: 7, TaskName: 'Travelling toward moon and entering into lunar orbit', StartDate: new Date('07/16/1969 04:52:00 AM'),
EndDate: new Date('07/16/1969 04:21:50 PM'), Predecessor: '6FS'
},
{
TaskID: 8, TaskName: 'Midcourse correction, sharpening the course and testing the engine',
StartDate: new Date('07/16/1969 11:22:00 PM'), EndDate: new Date('07/17/1969 05:21:50 AM')
},
{
TaskID: 9, TaskName: 'Reached half the distance spanning between earth and moon',
StartDate: new Date('07/17/1969 05:22:00 AM'), EndDate: new Date('07/17/1969 08:00:50 PM')
},
{
TaskID: 10, TaskName: 'Reached 3/4th distance spanning between earth and moon',
StartDate: new Date('07/17/1969 8:02:00 PM'), EndDate: new Date('07/18/1969 04:21:50 PM')
},
{
TaskID: 11, TaskName: 'Reached distance 45000 miles from moon',
StartDate: new Date('07/18/1969 11:22:00 PM'), EndDate: new Date('07/19/1969 05:21:50 PM')
},
]
},
{
TaskID: 12,
TaskName: 'Lunar descent',
StartDate: new Date('07/19/1969 05:21:50 PM'),
subtasks: [
{
TaskID: 13, TaskName: 'Lunar Orbiting (30 orbits)', StartDate: new Date('07/19/1969 05:21:50 PM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '11FS'
},
{
TaskID: 14, TaskName: 'Landing site identified', StartDate: new Date('07/20/1969 12:52:00 AM'),
EndDate: new Date('07/20/1969 12:52:00 AM'), Predecessor: '13FS'
},
{
TaskID: 15, TaskName: 'Eagle separated from Columbia.', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 05:44:00 PM')
},
{
TaskID: 16, TaskName: 'Eagle’s decent to Moon', StartDate: new Date('07/20/1969 05:44:00 PM'),
EndDate: new Date('07/20/1969 08:16:40 PM'), Predecessor: '15FS'
}
]
},
{
TaskID: 17,
TaskName: 'Landing',
StartDate: new Date('07/20/1969 08:17:40 PM'),
subtasks: [
{
TaskID: 18, TaskName: 'Eagle’s touch down', StartDate: new Date('07/20/1969 08:17:40 PM'),
EndDate: new Date('07/20/1969 08:17:40 PM')
},
{
TaskID: 19, TaskName: 'Radio communication and Performing post landing checklist',
StartDate: new Date('07/20/1969 08:17:40 PM'), EndDate: new Date('07/20/1969 11:43:00 PM'), Predecessor: '18FS'
},
{
TaskID: 20, TaskName: 'Preparations for EVA (Extra Vehicular Activity)',
StartDate: new Date('07/20/1969 11:43:00 PM'), EndDate: new Date('07/21/1969 02:39:33 AM'), Predecessor: '19FS'
},
{
TaskID: 21, TaskName: 'Hatch open and climbing down the moon', StartDate: new Date('07/21/1969 02:39:33 AM'),
EndDate: new Date('07/21/1969 02:56:15 AM'), Predecessor: '20FS'
},
{
TaskID: 22, TaskName: 'Armstrong stepped down on the moon', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM'), Predecessor: '21FS'
},
]
},
{
TaskID: 23,
TaskName: 'Lunar surface operations',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 24, TaskName: 'Soil sample collections', StartDate: new Date('07/21/1969 02:56:15 AM'),
EndDate: new Date('07/21/1969 03:11:00 AM')
},
{
TaskID: 25, TaskName: 'Aldrin joined Armstrong', StartDate: new Date('07/21/1969 03:11:00 AM'),
EndDate: new Date('07/21/1969 03:41:00 AM'), Predecessor: '24FS'
},
{
TaskID: 26, TaskName: 'planted the Lunar Flag Assembly', StartDate: new Date('07/21/1969 03:41:00 AM'),
EndDate: new Date('07/21/1969 03:46:00 AM'), Predecessor: '25FS'
},
{
TaskID: 27, TaskName: 'President Richard Nixon’s telephone-radio transmission ',
StartDate: new Date('07/21/1969 03:48:00 AM'), EndDate: new Date('07/21/1969 03:51:00 AM')
},
{
TaskID: 28, TaskName: 'Collect rock samples, photos and other mission controls',
StartDate: new Date('07/21/1969 03:52:00 AM'), EndDate: new Date('07/21/1969 04:50:00 AM')
},
]
},
{
TaskID: 29,
TaskName: 'Lunar ascent',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 30, TaskName: 'Climbing the eagle to ascent', StartDate: new Date('07/21/1969 04:51:00 AM'),
EndDate: new Date('07/21/1969 05:00:00 AM')
},
{
TaskID: 31, TaskName: 'Hatch closing', StartDate: new Date('07/21/1969 05:01:00 AM'),
EndDate: new Date('07/21/1969 05:01:00 AM'), Predecessor: '30FS'
},
{
TaskID: 32, TaskName: 'Final housekeeping', StartDate: new Date('07/21/1969 05:02:00 AM'),
EndDate: new Date('07/21/1969 08:00:00 AM')
},
{
TaskID: 33, TaskName: 'Resting of astronauts', StartDate: new Date('07/21/1969 08:00:00 AM'),
EndDate: new Date('07/21/1969 03:00:00 PM'), Predecessor: '32FS'
},
{
TaskID: 34, TaskName: 'Preparation for lift off and Ascent engine started', StartDate: new Date('07/21/1969 03:00:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '33FS'
},
{
TaskID: 35, TaskName: 'Eagle lifted off', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 05:54:00 PM'), Predecessor: '34FS'
},
{
TaskID: 36, TaskName: 'Eagle’s travel toward Columbia', StartDate: new Date('07/21/1969 05:54:00 PM'),
EndDate: new Date('07/21/1969 09:23:00 PM'), Predecessor: '35FS'
},
]
},
{
TaskID: 37,
TaskName: 'Return',
StartDate: new Date('07/21/1969 09:24:00 PM'),
subtasks: [
{
TaskID: 38, TaskName: 'Eagle docked with Columbia', StartDate: new Date('07/21/1969 09:24:00 PM'),
EndDate: new Date('07/21/1969 09:35:00 PM')
},
{
TaskID: 39, TaskName: 'Eagle’s ascent stage jettisoned into lunar orbit', StartDate: new Date('07/21/1969 09:35:00 PM'),
EndDate: new Date('07/21/1969 11:41:00 PM'), Predecessor: '38FS'
},
]
},
{
TaskID: 40,
TaskName: 'Decent toward earth and Splashdown',
StartDate: new Date('07/21/1969'),
subtasks: [
{
TaskID: 41, TaskName: 'Spacecraft reaches 1/4th distance spanning between moon and earth',
StartDate: new Date('07/21/1969 11:50:00 PM'), EndDate: new Date('07/22/1969 04:40:00 PM')
},
{
TaskID: 42, TaskName: 'Spacecraft travels to midway point of journey',
StartDate: new Date('07/22/1969 04:40:00 PM'), EndDate: new Date('07/23/1969 04:00:00 PM'), Predecessor: '41FS'
},
{
TaskID: 43, TaskName: 'Spacecraft travels to 3/4th point of journey', StartDate: new Date('07/23/1969 04:40:00 PM'),
EndDate: new Date('07/24/1969 10:00:00 AM'), Predecessor: '42FS'
},
{
TaskID: 44, TaskName: 'Crew prepares for splashdown', StartDate: new Date('07/24/1969 11:47:00 AM'),
EndDate: new Date('07/24/1969 04:20:00 PM')
},
{
TaskID: 45, TaskName: 'Command and service modules separates', StartDate: new Date('07/24/1969 04:20:00 PM'),
EndDate: new Date('07/24/1969 04:35:00 PM'), Predecessor: '44FS'
},
{
TaskID: 46, TaskName: 'Command module re-enters the Earth’s atmosphere', StartDate: new Date('07/24/1969 04:35:00 PM'),
EndDate: new Date('07/24/1969 04:50:00 PM'), Predecessor: '45FS'
},
{
TaskID: 47, TaskName: 'Spacecraft splashes near USS hornet', StartDate: new Date('07/24/1969 04:51:00 PM'),
EndDate: new Date('07/24/1969 04:51:00 PM')
},
]
}
];
exports.customizedData = [
{
TaskId: 1, TaskName: '90th Academy awards kicks-off',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:00:00 PM'), Duration: 0,
},
{
TaskId: 2, TaskName: 'Oscar moments', Predecessor: '1FS', column3: 'Jimmy kimmel hosts the show',
StartDate: new Date('03/05/2015 06:00:00 PM'), EndDate: new Date('03/05/2015 06:15:00 PM')
},
{
TaskId: 3, TaskName: 'Actor in a supporting role', Predecessor: '2FS',
StartDate: new Date('03/05/2015 06:16:00 PM'), EndDate: new Date('03/05/2015 06:25:00 PM'),
Winner: 'Sam Rockwell', Movie: 'Three Billboards Outside Ebbing, Missouri.'
},
{
TaskId: 4, TaskName: 'Hair and makeup', Movie: 'Darkest Hour', Predecessor: '3FS',
StartDate: new Date('03/05/2015 06:26:00 PM'), EndDate: new Date('03/05/2015 06:32:00 PM')
},
{
TaskId: 5, TaskName: 'Costume design', Winner: 'Mark Bridges', Movie: 'Phantom Thread', Predecessor: '4FS',
StartDate: new Date('03/05/2015 06:33:00 PM'), EndDate: new Date('03/05/2015 06:40:00 PM')
},
{
TaskId: 6, TaskName: 'Documentary feature', Winner: 'Bryan Fogel', Movie: ' Icarus', Predecessor: '5FS',
StartDate: new Date('03/05/2015 06:41:00 PM'), EndDate: new Date('03/05/2015 06:58:00 PM')
},
{
TaskId: 7, TaskName: 'Best sound editing and sound mixing', Winner: 'Richard King and Alex Gibson', Movie: 'Dunkirk',
StartDate: new Date('03/05/2015 06:59:00 PM'), EndDate: new Date('03/05/2015 07:10:00 PM'), Predecessor: '6FS'
},
{
TaskId: 8, TaskName: 'Production design', Movie: 'The Shape of Water', Predecessor: '7FS',
StartDate: new Date('03/05/2015 07:11:00 PM'), EndDate: new Date('03/05/2015 07:15:00 PM')
},
{
TaskId: 9, TaskName: 'Oscar performance', column3: 'Second performance of the night is "Remember Me" from Coco',
StartDate: new Date('03/05/2015 07:16:00 PM'), EndDate: new Date('03/05/2015 07:23:00 PM'), Predecessor: '8FS'
},
{
TaskId: 10, TaskName: 'Best foreign language film goes', Movie: 'A Fantastic Woman', Predecessor: '9FS',
StartDate: new Date('03/05/2015 07:24:00 PM'), EndDate: new Date('03/05/2015 07:29:00 PM')
},
{
TaskId: 11, TaskName: 'Best supporting actress', Winner: 'Allison Janney', Movie: 'I, Tonya',
StartDate: new Date('03/05/2015 07:30:00 PM'), EndDate: new Date('03/05/2015 07:35:00 PM'), Predecessor: '10FS'
},
{
TaskId: 12, TaskName: 'Best animated short', Winner: 'Kobe Bryant', Movie: 'Dear Basketball',
StartDate: new Date('03/05/2015 07:36:00 PM'), EndDate: new Date('03/05/2015 07:45:00 PM'), Predecessor: '11FS'
},
{
TaskId: 13, TaskName: 'Award for best animated feature.', Movie: 'Coco', Predecessor: '12FS',
StartDate: new Date('03/05/2015 07:46:00 PM'), EndDate: new Date('03/05/2015 07:52:00 PM')
},
{
TaskId: 14, TaskName: 'Best visual effects.', Movie: 'Blade Runner 2049', Predecessor: '13FS',
StartDate: new Date('03/05/2015 07:53:00 PM'), EndDate: new Date('03/05/2015 07:56:00 PM')
},
{
TaskId: 15, TaskName: 'Achievement in film editing', Movie: 'Dunkirk', Predecessor: '14FS',
StartDate: new Date('03/05/2015 07:57:00 PM'), EndDate: new Date('03/05/2015 07:59:00 PM')
},
{
TaskId: 16, TaskName: 'Oscar moments', column3: 'Jimmy Kimmel surprises moviegoers along with celebrities',
StartDate: new Date('03/05/2015 08:00:00 PM'), EndDate: new Date('03/05/2015 08:09:00 PM'), Predecessor: '15FS'
},
{
TaskId: 17, TaskName: 'Best documentary short', Movie: 'Heaven is a Traffic Jam on the 405', Predecessor: '16FS',
StartDate: new Date('03/05/2015 08:10:00 PM'), EndDate: new Date('03/05/2015 08:12:00 PM')
},
{
TaskId: 18, TaskName: 'Best live action short film', Movie: 'The Silent Child', Predecessor: '17FS',
StartDate: new Date('03/05/2015 08:13:00 PM'), EndDate: new Date('03/05/2015 08:15:00 PM')
},
{
TaskId: 19, TaskName: 'Oscar performance',
column3: 'Jimmy Kimmel surprCommon and Andra Day performs "Stand Up for Something" by "Marshall"',
StartDate: new Date('03/05/2015 08:16:00 PM'), EndDate: new Date('03/05/2015 08:25:00 PM'), Predecessor: '18FS'
},
{
TaskId: 20, TaskName: 'Oscar moments',
column3: 'The Oscars are showcasing the #MeToo and #TimesUp movements with a montage and interviews with actors and filmmakers',
StartDate: new Date('03/05/2015 08:26:00 PM'), EndDate: new Date('03/05/2015 08:29:00 PM'), Predecessor: '19FS'
},
{
TaskId: 21, TaskName: 'Oscar for best adapted screenplay', Winner: 'James Ivory', Movie: 'Call Me By Your Name',
StartDate: new Date('03/05/2015 08:30:00 PM'), EndDate: new Date('03/05/2015 08:35:00 PM'), Predecessor: '20FS'
},
{
TaskId: 22, TaskName: 'Oscar for best original screenplay', Winner: 'Jordan Peele', Movie: 'Get Out',
StartDate: new Date('03/05/2015 08:36:00 PM'), EndDate: new Date('03/05/2015 08:44:00 PM'), Predecessor: '21FS'
},
{
TaskId: 23, TaskName: 'Oscar moments',
column3: 'Who’s trending on Twitter at the Oscars? Actors Timothée Chalamet, Chadwick Boseman,' +
'Tom Holland, Lupita Nyong’o and Adam Rippon.',
StartDate: new Date('03/05/2015 08:40:00 PM'), EndDate: new Date('03/05/2015 08:45:00 PM'), Predecessor: '22FS'
},
{
TaskId: 24, TaskName: 'Best cinematography', Winner: 'Roger A. Deakins', Movie: 'Blade Runner 2049',
StartDate: new Date('03/05/2015 08:46:00 PM'), EndDate: new Date('03/05/2015 08:48:00 PM'), Predecessor: '23FS'
},
{
TaskId: 25, TaskName: 'Oscar performance',
column3: 'Keala Settle performs the nominated song "This is Me" from "The Greatest Showman".',
StartDate: new Date('03/05/2015 08:49:00 PM'), EndDate: new Date('03/05/2015 08:54:00 PM'), Predecessor: '24FS'
},
{
TaskId: 26, TaskName: 'Best original score', Movie: 'The Shape of Water', Predecessor: '25FS',
StartDate: new Date('03/05/2015 08:55:00 PM'), EndDate: new Date('03/05/2015 08:59:00 PM')
},
{
TaskId: 27, TaskName: 'Award for original song', Winner: 'Remember Me', Movie: 'Coco', Predecessor: '26FS',
StartDate: new Date('03/05/2015 09:00:00 PM'), EndDate: new Date('03/05/2015 09:07:00 PM')
},
{
TaskId: 28, TaskName: 'Oscar moments', column3: 'Time to pay tribute to those in the cinema world we lost last year',
StartDate: new Date('03/05/2015 09:05:00 PM'), EndDate: new Date('03/05/2015 09:11:00 PM'), Predecessor: '27FS'
},
{
TaskId: 29, TaskName: 'Oscar for best director', Winner: 'Guillermo del Toro', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:12:00 PM'), EndDate: new Date('03/05/2015 09:19:00 PM'), Predecessor: '28FS'
},
{
TaskId: 30, TaskName: 'Best actor in a leading role', Winner: 'Gary Oldman', Movie: 'The Shape of Water',
StartDate: new Date('03/05/2015 09:20:00 PM'), EndDate: new Date('03/05/2015 09:29:00 PM'), Predecessor: '29FS'
},
{
TaskId: 31, TaskName: 'Best leading actress', Winner: 'Frances McDormand', Movie: 'Three Billboards Outside Ebbing, Missouri',
StartDate: new Date('03/05/2015 09:30:00 PM'), EndDate: new Date('03/05/2015 09:44:00 PM'), Predecessor: '30FS'
},
{
TaskId: 32, TaskName: 'Oscar for best picture.', Movie: 'The Shape of Water', Predecessor: '31FS',
StartDate: new Date('03/05/2015 09:45:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM')
},
{
TaskId: 33, TaskName: '90th Academy awards wind-up', Predecessor: '32FS',
StartDate: new Date('03/05/2015 10:00:00 PM'), EndDate: new Date('03/05/2015 10:00:00 PM'), Duration: 0
}
];
exports.projectResources = [
{ resourceId: 1, resourceName: 'Project Manager' },
{ resourceId: 2, resourceName: 'Software Analyst' },
{ resourceId: 3, resourceName: 'Developer' },
{ resourceId: 4, resourceName: 'Testing Engineer' }
];
exports.projectData = [
{
taskID: 1,
taskName: 'Project Schedule',
startDate: new Date('02/08/2019'),
endDate: new Date('03/15/2019'),
subtasks: [
{
taskID: 2,
taskName: 'Planning',
startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'),
subtasks: [
{
taskID: 3, taskName: 'Plan timeline', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 4, taskName: 'Plan budget', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 5, taskName: 'Allocate resources', startDate: new Date('02/08/2019'),
endDate: new Date('02/12/2019'), duration: 5, progress: '100', resourceId: [1]
},
{
taskID: 6, taskName: 'Planning complete', startDate: new Date('02/10/2019'),
endDate: new Date('02/10/2019'), duration: 0, predecessor: '3FS,4FS,5FS'
}
]
}, {
taskID: 7,
taskName: 'Design',
startDate: new Date('02/15/2019'),
endDate: new Date('02/19/2019'),
subtasks: [
{
taskID: 8, taskName: 'Software Specification', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '60', predecessor: '6FS', resourceId: [2]
},
{
taskID: 9, taskName: 'Develop prototype', startDate: new Date('02/15/2019'),
endDate: new Date('02/17/2019'), duration: 3, progress: '100', predecessor: '6FS', resourceId: [3]
},
{
taskID: 10, taskName: 'Get approval from customer', startDate: new Date('02/18/2019'),
endDate: new Date('02/19/2019'), duration: 2, progress: '100', predecessor: '9FS', resourceId: [1]
},
{
taskID: 11, taskName: 'Design complete', startDate: new Date('02/17/2019'),
endDate: new Date('02/17/2019'), duration: 0, predecessor: '10FS'
}
]
},
{
taskID: 12,
taskName: 'Implementation Phase',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 13,
taskName: 'Phase 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 14,
taskName: 'Implementation Module 1',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 15, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 16, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', predecessor: '11FS', resourceId: [3]
},
{
taskID: 17, taskName: 'Testing', startDate: new Date('02/25/2019'),
endDate: new Date('02/26/2019'), duration: 2, progress: '0', predecessor: '15FS,16FS', resourceId: [4]
},
{
taskID: 18, taskName: 'Bug fix', startDate: new Date('03/01/2019'),
endDate: new Date('03/02/2019'), duration: 2, progress: '0', predecessor: '17FS', resourceId: [3]
},
{
taskID: 19, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/07/2019'), duration: 2, progress: '0', predecessor: '18FS', resourceId: [1]
},
{
taskID: 20, taskName: 'Phase 1 complete', startDate: new Date('03/05/2019'),
endDate: new Date('03/05/2019'), duration: 0, predecessor: '19FS'
}
]
}]
},
{
taskID: 21,
taskName: 'Phase 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [{
taskID: 22,
taskName: 'Implementation Module 2',
startDate: new Date('02/25/2019'),
endDate: new Date('03/05/2019'),
subtasks: [
{
taskID: 23, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 24, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/25/2019'), duration: 4, progress: '50', resourceId: [3]
},
{
taskID: 25, taskName: 'Testing', startDate: new Date('02/26/2019'),
endDate: new Date('03/01/2019'), duration: 2, progress: '0', predecessor: '23FS,24FS', resourceId: [4]
},
{
taskID: 26, taskName: 'Bug fix', startDate: new Date('03/02/2019'),
endDate: new Date('03/03/2019'), duration: 2, progress: '0', predecessor: '25FS', resourceId: [3]
},
{
taskID: 27, taskName: 'Customer review meeting', startDate: new Date('03/07/2019'),
endDate: new Date('03/05/2019'), duration: 2, progress: '0', predecessor: '26FS', resourceId: [1]
},
{
taskID: 28, taskName: 'Phase 2 complete', startDate: new Date('03/03/2019'),
endDate: new Date('03/03/2019'), duration: 0, predecessor: '27FS'
}
]
}]
},
{
taskID: 29,
taskName: 'Phase 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [{
taskID: 30,
taskName: 'Implementation Module 3',
startDate: new Date('02/25/2019'),
endDate: new Date('03/07/2019'),
subtasks: [
{
taskID: 31, taskName: 'Development Task 1', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 32, taskName: 'Development Task 2', startDate: new Date('02/22/2019'),
endDate: new Date('02/24/2019'), duration: 3, progress: '50', resourceId: [3]
},
{
taskID: 33, taskName: 'Testing', startDate: new Date('02/25/2019'), endDate: new Date('02/26/2019'),
duration: 2, progress: '0', predecessor: '31FS,32FS', resourceId: [4]
},
{
taskID: 34, taskName: 'Bug fix', startDate: new Date('03/01/2019'), endDate: new Date('03/05/2019'),
duration: 2, progress: '0', predecessor: '33FS', resourceId: [3]
},
{
taskID: 35, taskName: 'Customer review meeting', startDate: new Date('03/03/2019'),
endDate: new Date('03/04/2019'), duration: 2, progress: '0', predecessor: '34FS',
resourceId: [1]
},
{
taskID: 36, taskName: 'Phase 3 complete', startDate: new Date('03/02/2019'),
endDate: new Date('03/02/2019'), duration: 0, predecessor: '35FS'
},
]
}]
}
]
},
{
taskID: 37, taskName: 'Integration', startDate: new Date('03/08/2019'), endDate: new Date('03/10/2019'), duration: 3,
progress: '0', predecessor: '20FS,28FS,36FS', resourceId: [3]
},
{
taskID: 38, taskName: 'Final Testing', startDate: new Date('03/11/2019'), endDate: new Date('03/12/2019'), duration: 2,
progress: '0', predecessor: '37FS', resourceId: [4]
},
{
taskID: 39, taskName: 'Final Delivery', startDate: new Date('03/10/2019'), endDate: new Date('03/10/2019'),
duration: 0, predecessor: '38FS'
}
]
}
];
exports.baselineData = [
{
TaskId: 1, TaskName: 'Receive vehicle and create job card', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:00:00 AM'), StartDate: new Date('03/05/2018 10:00:00 AM'),
EndDate: new Date('03/05/2018 10:00:00 AM')
},
{
TaskId: 2, TaskName: 'Allot mechanic and send vehicle to service bay', BaselineStartDate: new Date('03/05/2018 10:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:15:00 AM'), StartDate: new Date('03/05/2018 10:15:00 AM'),
EndDate: new Date('03/05/2018 10:20:00 AM')
},
{
TaskId: 3, TaskName: 'Change the Receive vehicle and create job cardengine oil',
BaselineStartDate: new Date('03/05/2018 10:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 10:45:00 AM'), StartDate: new Date('03/05/2018 10:20:00 AM'),
EndDate: new Date('03/05/2018 10:35:00 AM')
},
{
TaskId: 4, TaskName: 'Replace the oil filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 5, TaskName: 'Replace the air filter', BaselineStartDate: new Date('03/05/2018 10:45:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:15:00 AM'), StartDate: new Date('03/05/2018 10:35:00 AM'),
EndDate: new Date('03/05/2018 11:00:00 AM')
},
{
TaskId: 6, TaskName: 'Replace the fuel filter', BaselineStartDate: new Date('03/05/2018 11:15:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:25:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:20:00 AM')
},
{
TaskId: 7, TaskName: 'Replace the cabin filter', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:20:00 AM'), StartDate: new Date('03/05/2018 11:00:00 AM'),
EndDate: new Date('03/05/2018 11:25:00 AM')
},
{
TaskId: 8, TaskName: 'Replace the spark plugs', BaselineStartDate: new Date('03/05/2018 11:00:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:30:00 AM'), StartDate: new Date('03/05/2018 11:25:00 AM'),
EndDate: new Date('03/05/2018 11:45:00 AM')
},
{
TaskId: 9, TaskName: 'Check level and refill brake fluid/clutch fluid', BaselineStartDate: new Date('03/05/2018 11:20:00 AM'),
BaselineEndDate: new Date('03/05/2018 11:40:00 AM'), StartDate: new Date('03/05/2018 11:30:00 AM'),
EndDate: new Date('03/05/2018 11:50:00 AM')
},
{
TaskId: 10, TaskName: 'Check Brake Pads/Liners, Brake Discs/Drums, and replace if worn out.',
BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 11, TaskName: 'Check level and refill power steering fluid', BaselineStartDate: new Date('03/05/2018 11:40:00 AM'),
BaselineEndDate: new Date('03/05/2018 12:00:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:15:00 PM')
},
{
TaskId: 12, TaskName: 'Check level and refill Automatic/Manual Transmission Fluid',
BaselineStartDate: new Date('03/05/2018 12:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 11:50:00 AM'),
EndDate: new Date('03/05/2018 12:20:00 PM')
},
{
TaskId: 13, TaskName: 'Grease and lubricate components', BaselineStartDate: new Date('03/05/2018 12:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 12:35:00 PM'), StartDate: new Date('03/05/2018 12:20:00 PM'),
EndDate: new Date('03/05/2018 12:45:00 PM')
},
{
TaskId: 14, TaskName: 'Inspect and replace the timing belt or timing chain if needed',
BaselineStartDate: new Date('03/05/2018 12:35:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:00:00 PM'), StartDate: new Date('03/05/2018 12:45:00 PM'),
EndDate: new Date('03/05/2018 1:00:00 PM')
},
{
TaskId: 15, TaskName: 'Wheel Balancing', BaselineStartDate: new Date('03/05/2018 1:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:20:00 PM'), StartDate: new Date('03/05/2018 1:00:00 PM'),
EndDate: new Date('03/05/2018 1:45:00 PM')
},
{
TaskId: 16, TaskName: 'Wheel Alignment', BaselineStartDate: new Date('03/05/2018 1:20:00 PM'),
BaselineEndDate: new Date('03/05/2018 1:45:00 PM'), StartDate: new Date('03/05/2018 1:45:00 PM'),
EndDate: new Date('03/05/2018 2:45:00 PM')
},
{
TaskId: 17, TaskName: 'Check for proper operation of all lights, wipers etc.', BaselineStartDate: new Date('03/05/2018 1:50:00 PM'),
BaselineEndDate: new Date('03/05/2018 02:30:00 PM'), StartDate: new Date('03/05/2018 02:45:00 PM'),
EndDate: new Date('03/05/2018 03:30:00 PM')
},
{
TaskId: 18, TaskName: 'Check for any Error codes in the ECU and take corrective action.',
BaselineStartDate: new Date('03/05/2018 2:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 3:30:00 PM'), StartDate: new Date('03/05/2018 03:30:00 PM'),
EndDate: new Date('03/05/2018 04:15:00 PM')
},
{
TaskId: 19, TaskName: 'Use scan tool read trouble code', BaselineStartDate: new Date('03/05/2018 03:30:00 PM'),
BaselineEndDate: new Date('03/05/2018 04:45:00 PM'), StartDate: new Date('03/05/2018 04:15:00 PM'),
EndDate: new Date('03/05/2018 04:45:00 PM')
},
{
TaskId: 20, TaskName: 'Exterior washing', BaselineStartDate: new Date('03/05/2018 04:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:15:00 PM'), StartDate: new Date('03/05/2018 04:45:00 PM'),
EndDate: new Date('03/05/2018 05:30:00 PM')
},
{
TaskId: 21, TaskName: 'Interior vacuuming', BaselineStartDate: new Date('03/05/2018 05:15:00 PM'),
BaselineEndDate: new Date('03/05/2018 05:45:00 PM'), StartDate: new Date('03/05/2018 05:30:00 PM'),
EndDate: new Date('03/05/2018 06:00:00 PM')
},
{
TaskId: 22, TaskName: 'Final service inspection', BaselineStartDate: new Date('03/05/2018 05:45:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:00:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
},
{
TaskId: 23, TaskName: 'Vehicle handover', BaselineStartDate: new Date('03/05/2018 06:00:00 PM'),
BaselineEndDate: new Date('03/05/2018 06:00:00 PM'), StartDate: new Date('03/05/2018 06:30:00 PM'),
EndDate: new Date('03/05/2018 06:30:00 PM')
}
];
});